Abstract

In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plant. The success of that installation was the enabling event for Anglo Platinum to proceed with a substantial investment in horizontal stirred milling technology. Since 2006 an additional three IsaMillsTM in concentrate regrind duties and a further 18 IsaMillsTM in the more technically challenging coarse grinding mainstream applications, have been commissioned in group Concentrator operations - bringing the total number of IsaMillsTM installed in Anglo Platinum plants to 22.A collaborative approach between Anglo Platinum and Xstrata Technology towards improving milling efficiency and reducing operating costs, through internal mill component wear optimization and operating recipe development, has resulted in further improvements in the overall success of IsaMillsTM in the flow sheets of many Anglo Platinum operations. The addition of IsaMillsTM in the Anglo Platinum flow sheets has improved plant PGM recoveries by as much as 5%.This paper explores the improvements made to the IsaMillsTM flow sheet and mill internal design and shares some of the operating experience with IsaMillsTM technology in Anglo Platinum
Citation

APA: C Rule  (2011)  IsaMill™ Design Improvements and Operational Performance at Anglo Platinum

MLA: C Rule IsaMill™ Design Improvements and Operational Performance at Anglo Platinum. The Australasian Institute of Mining and Metallurgy, 2011.