Islais Creek Contract E: Tunneling Through Jet Grouted Bay Mud

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 132 KB
- Publication Date:
- Jan 1, 1997
Abstract
Islais Creek Contract E, a transport/storage tunnel in San Francisco, was visited on a fieldtrip during construction by delegates to the 1995 RETC. This paper is a follow-up to that fieldtrip. The project’s two tunnels are 3.7 m and 3.2 m finished diameter, 155 m and 77 m long, respectively. The contractor used 1,000 overlapping jet grout columns to pre-treat the weak Bay Mud along the tunnel alignments, then mined them with an open faced tunnel shield, eliminating the need for compressed air tunneling. This paper documents the jet grouting program and the tunneling operation used on the project.