Islais Creek Contract E: Tunneling Through Jet Grouted Bay Mud

Society for Mining, Metallurgy & Exploration
D. N. Adams M. J. Robison M. M. Wong
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
132 KB
Publication Date:
Jan 1, 1997

Abstract

Islais Creek Contract E, a transport/storage tunnel in San Francisco, was visited on a fieldtrip during construction by delegates to the 1995 RETC. This paper is a follow-up to that fieldtrip. The project’s two tunnels are 3.7 m and 3.2 m finished diameter, 155 m and 77 m long, respectively. The contractor used 1,000 overlapping jet grout columns to pre-treat the weak Bay Mud along the tunnel alignments, then mined them with an open faced tunnel shield, eliminating the need for compressed air tunneling. This paper documents the jet grouting program and the tunneling operation used on the project.
Citation

APA: D. N. Adams M. J. Robison M. M. Wong  (1997)  Islais Creek Contract E: Tunneling Through Jet Grouted Bay Mud

MLA: D. N. Adams M. J. Robison M. M. Wong Islais Creek Contract E: Tunneling Through Jet Grouted Bay Mud. Society for Mining, Metallurgy & Exploration, 1997.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account