Journal: 21st Annual Photo Contest - Best of Show "Pinkerton Tunnel Open Cut Project"

- Organization:
- International Society of Explosives Engineers
- Pages:
- 1
- File Size:
- 309 KB
- Publication Date:
- Jan 1, 2015
Abstract
The Pinkerton Tunnel open cut project is part of the National Gateway Clearance Initiative improvement project to achieve a minimum of 21 feet of vertical clearance along CSX Transportation rail corridor so that double-stacked intermodal railcars can be transported between mid-Atlantic states and their ports to midwest markets in the U.S. This project involved drilling and blasting of 1.2 million bank cubic yards of rock over a 14 month period while maintaining rail traffic of two passenger and 38 freight trains daily. See story and photos, page 6.
Citation
APA:
(2015) Journal: 21st Annual Photo Contest - Best of Show "Pinkerton Tunnel Open Cut Project"MLA: Journal: 21st Annual Photo Contest - Best of Show "Pinkerton Tunnel Open Cut Project". International Society of Explosives Engineers, 2015.