Kramer Tunnel—Construction of the Ventilation Shaft Project in Germany’s Southern Alps - RETC2023

Society for Mining, Metallurgy & Exploration
Lukas Walder Richard Gradnik Roland Arnold Raphael Zuber
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
16
File Size:
315 KB
Publication Date:
Jun 13, 2023

Abstract

This paper presents the construction of the ventilation shaft for the single-tube, doublelane Kramer tunnel. The project is located in the Federal State of Bavaria, Germany. This road tunnel, which has been under construction since December 2019, is the key component of the western bypass of the town of Garmisch-Partenkirchen. Once completed, it will relieve the town’s central district from enormous volumes of traffic. The contractor is the joint venture named ARGE Kramertunnel consisting of BeMo Tunnelling and Subterra. The whole project will be completed and handed over to the project owner, Staatliches Bauamt Weilheim, in 2023. The opening of the entire bypass section including the tunnel to traffic is planned for 2024. The tunnel, with a total length of 3,609 m (2.24 miles) and an estimated cost of EUR 178 million incl. VAT (US-Dollar 201 million), is designed as a single-tube, double-lane structure with one traffic lane for each direction of travel. The safety issue that exists for singletube tunnels is solved by a parallel escape tunnel passable for vehicles. For tunnel ventilation, an intermediate shaft has been designed with a depth of approximately 90 m (295 feet) and an inner diameter of 4.5 m (14.8 feet). All tunnels and ducts are excavated according to the principles of the New Austrian Tunnelling Method (NATM). The geological and hydrogeological conditions, the change in the profile (from round to square geometry), and also the shaft being located at a high elevation presented a demanding technical and logistical challenge. The site arrangement with the pit bank was located in a cut, the slopes of which had to be stabilized with shotcrete and soil nails. This excavation was carried out from the fall of 2020 to the beginning of 2021 because construction operations had to be completed outside the nesting period of protected birds.
Citation

APA: Lukas Walder Richard Gradnik Roland Arnold Raphael Zuber  (2023)  Kramer Tunnel—Construction of the Ventilation Shaft Project in Germany’s Southern Alps - RETC2023

MLA: Lukas Walder Richard Gradnik Roland Arnold Raphael Zuber Kramer Tunnel—Construction of the Ventilation Shaft Project in Germany’s Southern Alps - RETC2023. Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account