La Caridad Hydrometallurgy Plant

Society for Mining, Metallurgy & Exploration
R. Mendoza C. Romero
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
6
File Size:
190 KB
Publication Date:
Jan 1, 1996

Abstract

The SX-EW plant consists of three parallel trains with two extraction and two stripping stages, with the mixing chambers situated on the same side of the settlers, using a coalescing launder to direct the solution flow to the outlet weirs in the side as the mixers. In the tankfarm the loaded organic tanks will include a coalescing packed column to separate the aqueous entrainment. Organic from gunk will be recovered in a packed column, instead of a centrifuge. The EW plant utilize polymer concrete cells with permanent stainless steel cathodes with edge strips on side and bottom, without wax.
Citation

APA: R. Mendoza C. Romero  (1996)  La Caridad Hydrometallurgy Plant

MLA: R. Mendoza C. Romero La Caridad Hydrometallurgy Plant. Society for Mining, Metallurgy & Exploration, 1996.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account