Long‑Distance Advanced Pre‑grouting Layer Flexible Reinforcement Mechanism and Its Application in Large Mining Height Coal Face

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 14
- File Size:
- 2113 KB
- Publication Date:
- Sep 27, 2022
Abstract
In terms of the technical problems of rib spalling in large mining height coal face, a long-distance advanced pre-grouting
layer flexible reinforcement technology is proposed in this paper. Based on the mechanism and failure mode of rib spalling
in the coal face, the mechanical properties of the aluminum plastic composite pipe were analyzed by using the tensile and
compression experiment. The deformation and strength characteristics of “flexible pipe + grouting” specimens were studied
by uniaxial compression test, splitting test, and shear test. The UDEC numerical simulation software was used to simulate
the reinforcement effect of “flexible pipe + grouting” at different positions. Combined with the field application, the feasibility
of long-distance advanced pre-grouting layer flexible reinforcement technology was verified. The test results show
the following: The coal face has the characteristics of brittle and large deformation. The aluminum plastic composite pipe
has the characteristics of good elongation and tensile strength, which can endure the large deformation of the coal face.
The “flexible pipe + grouting” can improve the tensile and shear strength of coal. The UDEC numerical simulation analysis
indicated that the grouting hole layout of “flexible pipe + grouting” has a significant difference in the reinforcement effect of
the coal face. Compared with single row grouting reinforcement, the reinforcement effect of double row grouting holes 1.5 m
and 3.0 m away from the roof is better. According to the field application, it is feasible to use aluminum plastic composite
pipe as a flexible grouting pipe to reinforce coal seam with 80–100 m long-distance pre-grouting. Long-distance advanced
pre-grouting layer flexible reinforcement technology can improve the daily production of coal and reduce the support cost
of the coal face. As a new method of reinforcement, long-distance layered flexible reinforcement has a significant effect on
the prevention and treatment of rib spalling in large mining height coal face.
Citation
APA:
(2022) Long‑Distance Advanced Pre‑grouting Layer Flexible Reinforcement Mechanism and Its Application in Large Mining Height Coal FaceMLA: Long‑Distance Advanced Pre‑grouting Layer Flexible Reinforcement Mechanism and Its Application in Large Mining Height Coal Face. Society for Mining, Metallurgy & Exploration, 2022.