Longwall Moves At Twentymile Recovery Mesh System

International Conference on Ground Control in Mining
Michael A. Berdine
Organization:
International Conference on Ground Control in Mining
Pages:
5
File Size:
1333 KB
Publication Date:
Jan 1, 2001

Abstract

In early 1997, Twentymile Coal Company took a dramatic departure from traditional longwall recovery methods. Previously, Twentymile's standard longwall meshing procedure included the use of chain link fencing material. Beginning with the 9-Right to 8-Right longwall recovery operation, Twentymile incorporated a polyester geogrid mesh system supplied by DYWIDAG-Systems International. This paper discusses the subsequent utilization of the polyester geogrid mesh system at Twentymile.
Citation

APA: Michael A. Berdine  (2001)  Longwall Moves At Twentymile Recovery Mesh System

MLA: Michael A. Berdine Longwall Moves At Twentymile Recovery Mesh System. International Conference on Ground Control in Mining, 2001.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account