Longwall Moves At Twentymile Recovery Mesh System

- Organization:
- International Conference on Ground Control in Mining
- Pages:
- 5
- File Size:
- 1333 KB
- Publication Date:
- Jan 1, 2001
Abstract
In early 1997, Twentymile Coal Company took a dramatic departure from traditional longwall recovery methods. Previously, Twentymile's standard longwall meshing procedure included the use of chain link fencing material. Beginning with the 9-Right to 8-Right longwall recovery operation, Twentymile incorporated a polyester geogrid mesh system supplied by DYWIDAG-Systems International. This paper discusses the subsequent utilization of the polyester geogrid mesh system at Twentymile.
Citation
APA:
(2001) Longwall Moves At Twentymile Recovery Mesh SystemMLA: Longwall Moves At Twentymile Recovery Mesh System. International Conference on Ground Control in Mining, 2001.