Low Overhead Secant Piles Drilled From Within A Shaft

Deep Foundations Institute
Stanley L. Worst Michael Grimm Parthiv Brahmbhatt Allen B. Stanton
Organization:
Deep Foundations Institute
Pages:
8
File Size:
1008 KB
Publication Date:
Oct 1, 2022

Abstract

Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead powerlines and sitting inside of a 40-foot deep, 50-foot diameter shaft and it becomes more about logistics than the actual drilling. The complexities associated with the Romeo Arm Interceptor Segment 5 Lining project are the focus of this paper, delving into the details that made it work successfully.
Citation

APA: Stanley L. Worst Michael Grimm Parthiv Brahmbhatt Allen B. Stanton  (2022)  Low Overhead Secant Piles Drilled From Within A Shaft

MLA: Stanley L. Worst Michael Grimm Parthiv Brahmbhatt Allen B. Stanton Low Overhead Secant Piles Drilled From Within A Shaft. Deep Foundations Institute, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account