LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 997 KB
- Publication Date:
- Jun 23, 2024
Abstract
Bessac's presence in Singapore started in 2014 with the construction of the Thomson metro line, which includes 18 miles of twin-bore tunnels and 22 stations split into 17 construction packages.
Bessac joint venture was allotted the T219 lot. The works include the construction of a new 660-foot (200-meter) long transfer station, two parallel 19-foot (5.8 m) ID tunnels and a pedestrian underpass. The urban context and the very soft ground stratum imposed to utilize unusual tunneling techniques, from upgrading a slurry TBM to a high-density slurry TBM to launch with very low cover and canopy pipe roofing completed with a MTBM without retrieval shaft.
Citation
APA:
(2024) LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024MLA: LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.