Anatolia Minerals Development Limited (AMDL) is constructing the Çöpler Gold Project in eastern Turkey and commenced mining in the fourth quarter of 2009 with gold production scheduled to begin in the fourth quarter of 2010. The project is a 15,500 tonnes/day oxide heap leach with three-stage crushing, agglomeration, carbon adsorption and electrowinning for final metal recovery. Leach solution copper levels are expected to be relatively low during the first two years of production but will increase in later years due to higher copper content in the mined and processed ore. Over the mine life approximately 40 million tones of ore will be placed on the leach pad, which will contain about 35,000 tonnes of copper. Metallurgical testing indicates copper extraction will vary by ore type and, if controls are not implemented, may lead to copper levels exceeding 1,000 mg/L in pregnant solution. High copper levels in leach solution have the deleterious effect of increasing cyanide consumption and potentially overwhelming the ability of the carbon circuit to effectively adsorb the principal economic metals, which in this case are gold and silver. Using data obtained from laboratory leach column testwork, the heap leach facility was modeled using METSIM process simulation software to estimate the build-up of copper in leach solution over the mine life. Laboratory testwork was also performed to evaluate process conditions for treating a portion of pregnant leach solution via sulfide addition to precipitate saleable copper as copper sulfide (Cu2S).
Citation

APA: M. Botz  (2011)  Managing Copper In Leach Solution At The Çöpler Gold Project: Laboratory Testing And Process Design - Introduction

MLA: M. Botz Managing Copper In Leach Solution At The Çöpler Gold Project: Laboratory Testing And Process Design - Introduction. Society for Mining, Metallurgy & Exploration, 2011.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account