Managing the development of secondary drawpoints in high stress areas at Goldex Mine RaSiM10 (Rockburst): 2022 Proceedings

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 3037 KB
- Publication Date:
- Apr 26, 2022
Abstract
Production began in the Deep 1 zone of Goldex mine in 2017 at a depth of 1,200 m. Stope dimensions are 50 m high by 22 m wide (along strike) and the panel thickness varies between 22 to 35 m. The Deep 1 orebody is 350 m high by 400 m along strike and 200 m from hanging wall to footwall. The mining method is longhole with paste backfill with a three dimensional primary/secondary sequence advancing upwards in a typical chevron approach and retreating from hanging wall to footwall in a V-shape from a central panel. Mining at a depth of 1,200 m in massive granodiorite brings challenges related to seismicity.
Citation
APA:
(2022) Managing the development of secondary drawpoints in high stress areas at Goldex Mine RaSiM10 (Rockburst): 2022 ProceedingsMLA: Managing the development of secondary drawpoints in high stress areas at Goldex Mine RaSiM10 (Rockburst): 2022 Proceedings. Society for Mining, Metallurgy & Exploration, 2022.