Matching Los Bronces Mine to Mill System Capacities Through Computer Simulation (276815f2-1a0e-4745-b0af-d6507ec1e8d6)

The American Institute of Mining, Metallurgical, and Petroleum Engineers
L. D. Cruz M. A. Solari I. A. Violic
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
4
File Size:
259 KB
Publication Date:
Jan 1, 1984

Abstract

In Exxon's Los Bronces Expansion Project in Chile, a stochastic simulation is performed to resolve the complex decision problem of matching the mine to mill system capacities from both technical and economic standpoints. The unique combination of weather conditions at the mine and the 30-km (18.6 mile) belt conveyor network for ore transport to the mill necessitates this analysis in the planning phase to optimize the design capacity of the system. Appropriate statistical distributions of major equipment performance, snow storm duration, power outage, etc., are developed from actual mine local records and manufacturers' specifications. The interactions of operational constraints including ore storage capacities, number and sizes of individual equipment, ore variations, and mine and mill production rates are studied more realistically than in a traditional planning approach. Details of the computer modeling and typical results of simulation studies are discussed.
Citation

APA: L. D. Cruz M. A. Solari I. A. Violic  (1984)  Matching Los Bronces Mine to Mill System Capacities Through Computer Simulation (276815f2-1a0e-4745-b0af-d6507ec1e8d6)

MLA: L. D. Cruz M. A. Solari I. A. Violic Matching Los Bronces Mine to Mill System Capacities Through Computer Simulation (276815f2-1a0e-4745-b0af-d6507ec1e8d6). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1984.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account