Cigar Lake is one of the world’s largest high-grade uranium mines. The ore mined at Cigar Lake is milled at Orano Canada Inc’s (Orano) McClean Lake mill. The average Cigar Lake ore uranium grade since the start of mining activities in 2014 is 17.8% U (range 8– 28%). To achieve budgeted production of 18 M lbs U3O8/yr the required average feed tonnage to the mill is about 45 kt/yr. Arsenic, occurring as arsenides and sulpharsenides, is one of the major elements of concern associated with Cigar Lake ore. The leaching process is a sulphuric acid leach under oxidizing conditions at near atmospheric pressure. The presence of arsenic in the ore consumes oxidant in leaching as well as ferric sulphate in tailings preparation for arsenic sequestration. The average arsenic grade since the start of mining at Cigar Lake is 0.57% As. Further, the ore is hosted in a matrix of sandstone and clay, which results in poor settling in CCD. The average uranium grade for the balance of Cigar Lake Phase 1 ore is expected to drop to 12.5% U and the average arsenic grade is expected to increase to 1.6 % As, with an annual average peak of 2.5%. Therefore the tonnage throughput required to sustainably meet the production target will increase to 55 kt per year. Orano partnered with Hatch Ltd. (Hatch) to perform a gap analysis study to identify key circuits and equipment in the mill that would require debottlenecking. A METSIM mass balance model of the McClean Lake mill was generated and validated with actual mill operating data. Various feed scenarios were then studied, and the outcome was a traffic light table, which highlighted feed scenarios that exceeded installed capacity of major equipment and circuits. The results provided the basis for the PDC for the pre-feasibility study. This paper will outline the results of the gap analysis, the mass balance model, the feed scenarios and the study undertaken to prepare the McClean Lake mill for the change in ore quality from Cigar Lake.
Citation
APA:
(2020) Mcclean Lake Mill 55 Kt Debottlenecking StudyMLA: Mcclean Lake Mill 55 Kt Debottlenecking Study. Canadian Institute of Mining, Metallurgy and Petroleum, 2020.