Milestone Reservoir Quarry Project: Collaborative Design Development Using CMAR - RETC2023

Society for Mining, Metallurgy & Exploration
Steve Miller James O’Shaughnessy Mike Hanna Nathan Scalla Savita Schlesinger
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
203 KB
Publication Date:
Jun 13, 2023

Abstract

Loudoun Water’s Quarry A (Milestone Reservoir) project involves conversion of a rock quarry to a billion-gallon raw water reservoir. The project includes a new 40 MGD pump station, deep intake shaft, and three drill and blast intake tunnels for accessing the reservoir. Due to concerns regarding constructability and construction risks, the project design was paused while a Construction Manager At-Risk (CMAR) contractor was procured. The CMAR contractor was engaged collaboratively with the design team to provide risk and constructability input for refining the design. Aspects of the original design, design modifications, and benefits of the CMAR collaboration will be presented.
Citation

APA: Steve Miller James O’Shaughnessy Mike Hanna Nathan Scalla Savita Schlesinger  (2023)  Milestone Reservoir Quarry Project: Collaborative Design Development Using CMAR - RETC2023

MLA: Steve Miller James O’Shaughnessy Mike Hanna Nathan Scalla Savita Schlesinger Milestone Reservoir Quarry Project: Collaborative Design Development Using CMAR - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account