Milestone Reservoir Quarry Project: Collaborative Design Development Using CMAR - RETC2023

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 203 KB
- Publication Date:
- Jun 13, 2023
Abstract
Loudoun Water’s Quarry A (Milestone Reservoir) project involves conversion of a rock
quarry to a billion-gallon raw water reservoir. The project includes a new 40 MGD
pump station, deep intake shaft, and three drill and blast intake tunnels for accessing
the reservoir. Due to concerns regarding constructability and construction risks, the
project design was paused while a Construction Manager At-Risk (CMAR) contractor
was procured. The CMAR contractor was engaged collaboratively with the design
team to provide risk and constructability input for refining the design. Aspects of the
original design, design modifications, and benefits of the CMAR collaboration will
be presented.