Mine-Mill Production Scheduling by Dynamic Programming (fbdeb2d8-f910-49ab-830b-f9c815130a51)

The American Institute of Mining, Metallurgical, and Petroleum Engineers
Ronald J. Roman
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
4
File Size:
298 KB
Publication Date:
Jan 1, 1972

Abstract

All mining and milling complexes can, within limits, operate at a variety of production rates. Factors of economic importance that are affected by production rates are costs per unit production, recovery, and product grade. Once the relationship between the production rate and cost is established, dynamic-programming techniques can define the optimum production schedule (i.e., the production schedule that maximizes the present worth of the operation) for the life of the deposit. In general, the optimum production rate is not constant for the life of the deposit, but declines gradually as the deposit is being exhausted.
Citation

APA: Ronald J. Roman  (1972)  Mine-Mill Production Scheduling by Dynamic Programming (fbdeb2d8-f910-49ab-830b-f9c815130a51)

MLA: Ronald J. Roman Mine-Mill Production Scheduling by Dynamic Programming (fbdeb2d8-f910-49ab-830b-f9c815130a51). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1972.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account