Mine production scheduling optimization at Newmont?s Twin Creeks Mine (7465774a-78ae-4d2d-b25a-11e1b6274c11)

Society for Mining, Metallurgy & Exploration
P. Kawahata
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
6
File Size:
2797 KB
Publication Date:
Jun 1, 2013

Abstract

Newmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on-site facilities depending on ore type and grade. Processing facilities operate under stringent geochemical blending constraints that must be met from mine ore deliveries and off-site sourced ore. To analyze various strategic options, the technical team utilizes the mathematical optimization approach. However, due to the size and complexity of the operation, there are unique challenges in optimizing life-of-mine production scheduling. This paper describes those challenges and methods developed to take advantage of different scheduling software to effectively compensate each other and result in reasonable guidance. This paper also describes how those scheduling results are reflected in detailed mine plan and cost estimate work.
Citation

APA: P. Kawahata  (2013)  Mine production scheduling optimization at Newmont?s Twin Creeks Mine (7465774a-78ae-4d2d-b25a-11e1b6274c11)

MLA: P. Kawahata Mine production scheduling optimization at Newmont?s Twin Creeks Mine (7465774a-78ae-4d2d-b25a-11e1b6274c11). Society for Mining, Metallurgy & Exploration, 2013.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account