Mining Dilution In Geostatistical Ore Reserve Estimation (7c5f8a4c-7cf8-429c-b9d9-a3ea851f72a2)

Society for Mining, Metallurgy & Exploration
Kadri Dagdelen
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
10
File Size:
503 KB
Publication Date:
Jan 1, 1996

Abstract

The importance of factoring mining dilution into feasibility stage ore reserve estimates is discussed. An example that relates the issue of mining dilution to the size of smallest volumes that can be mined selectively is given. Relationship between the size of the selective mining units (SMU's) and the variance of their average grade is presented. The concept of variance reduction and its use in factoring mining dilution into geostatistical ore reserve estimation is described. An approach to estimate variance reduction factor by way of conditional simulation is introduced.
Citation

APA: Kadri Dagdelen  (1996)  Mining Dilution In Geostatistical Ore Reserve Estimation (7c5f8a4c-7cf8-429c-b9d9-a3ea851f72a2)

MLA: Kadri Dagdelen Mining Dilution In Geostatistical Ore Reserve Estimation (7c5f8a4c-7cf8-429c-b9d9-a3ea851f72a2). Society for Mining, Metallurgy & Exploration, 1996.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account