Modifications to the coal-preparation circuit at the Grootegeluk Coal Mine to improve its efficiency

The Southern African Institute of Mining and Metallurgy
P. E. Ventert C. van Loggerenbergt
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
12
File Size:
905 KB
Publication Date:
Jan 1, 1992

Abstract

A strong incentive exists for the coal-preparation engineer to improve plant efficiency by modifying circuits and upgrading process equipment, since these result in lower production costs and more valuable plant products. At the Grootegeluk Coal Mine, it was found that the overall plant efficiency could be improved by modifications to the dense-medium circuits, the installation of additional process equipment for the recovery of fine coal, and improvement of the fine-material processing circuit. Apart from these modifications, there is still potential to increase the plant efficiency, particularly in the utilization of plant waste, the recovery of slimes, and even the improvement of cycloning performance as a result of new cyclone design. This paper points to the potential wealth locked up in existing coal-preparation plants, and shows how the coal-preparation engineer, with new technology at his disposal, can unlock this wealth.
Citation

APA: P. E. Ventert C. van Loggerenbergt  (1992)  Modifications to the coal-preparation circuit at the Grootegeluk Coal Mine to improve its efficiency

MLA: P. E. Ventert C. van Loggerenbergt Modifications to the coal-preparation circuit at the Grootegeluk Coal Mine to improve its efficiency. The Southern African Institute of Mining and Metallurgy, 1992.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account