Abstract
Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations represents less than 12 hours maximum coal demand. This creates an extremely dynamic operating environment, which is further complicated with significant variations in both excavating and transportation plant capabilities. To achieve set objectives, including- I adequate reserves, 2 coal supply reliability, 3 cyclic plant maintenance, 4 minimal cost of coal, scheduling of the operation requires constant monitoring and reappraisal.
Citation
APA:
(1989) Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)MLA: Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34). The Australasian Institute of Mining and Metallurgy, 1989.