Narrow Vein Long Hole Stoping

Society for Mining, Metallurgy & Exploration
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
4
File Size:
243 KB
Publication Date:
Jan 1, 2012

Abstract

Due to deposit shape and dimension, narrow vein makes reserve modeling, geological control, stope design, drill and blasting more challenging. It needs high standard quality control as errors can be created easily, which could cause significant amount of ore loss or dilution. From channel sampling, survey control, reserve modeling, drill hole design, blasting, communication with underground drillers to backfill, this paper illustrated every step and its quality control of a long hole stope mining. Compared to other narrow vein mining methods (cut and fill and shrinkage), long hole stoping means higher production, less labor, and significantly lower cost when deposit characteristics allowed.
Citation

APA:  (2012)  Narrow Vein Long Hole Stoping

MLA: Narrow Vein Long Hole Stoping. Society for Mining, Metallurgy & Exploration, 2012.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account