New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

International Society of Explosives Engineers
Alain Mestanza Samir Garcia
Organization:
International Society of Explosives Engineers
Pages:
7
File Size:
920 KB
Publication Date:
Jan 21, 2025

Abstract

This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining phases, however, in phase 05 north, there is the construction of a shaft with a height of 375 meters, the function of this structure is to collect and drain the water coming from the pit, there is the importance of preserving its stability and keeping it operational, guaranteeing the sustainability of the operation. For this, a controlled blasting plan was developed that goes from level 4530 to level 4455 to place the central well on a bench, reactivating the pools.
Citation

APA: Alain Mestanza Samir Garcia  (2025)  New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

MLA: Alain Mestanza Samir Garcia New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.. International Society of Explosives Engineers, 2025.