New Hydrometallurgical Process of Copper Anode Slimes at Saganoseki Smelter & Refinery

The Minerals, Metals and Materials Society
Akinori Toraiwa Yoshifumi Abe
Organization:
The Minerals, Metals and Materials Society
Pages:
6
File Size:
317 KB
Publication Date:
Jan 1, 2000

Abstract

"Nippon Mining & Metals started a new copper anode slime treatment plant that processes slimes in a chloride media. The basic plan of the process was proposed by Mr. James E. Hoffmann and Nippon Mining & Metals modified and advanced to produce precious metals in acceptable qualities for the company. The process has a wet chlorination stage of decopperized slimes, a solvent extraction and a reduction stages of gold, a silver chloride reduction stage and separative reduction stage of its gold extraction raffinate. The new plant of this process started in 1997 and has been operated in good condition.IntroductionThe old anode slime treatment plant of Nippon Mining & Metals, located in it's Hitachi Refinery, processed anode slimes through a combination of pyrometarllurgical processing and electrorefining. There was a need to plan a future of the plant because the maintenance cost increased year by year and a new selenium registration was going to be applied to the plant. Some plans were discussed and the result was that the process proposed by Mr. Hoffmann was superior among them.Nippon Mining & Metals started 'to examine the process and the experimental result showed that the process had an ability to be its new process but further research should be necessary to produce precious metals in acceptable qualities. The final process flow has some modified and additional stages to be suitable for its requirement. Silver processing stage is quite changed. Gold extraction stage has a new step to polish gold loading DBC. Gold extraction raffinate treatment stage is advanced to be able to recover precious metals, selenium and tellurium, separately. Aeration under atmospheric pressure is employed in decopperizing stage.The basic design of the new plant started in 1995 and finished in 1997. The construction of the new plant began in April 1997 and finished in October. The plant has been operating well after the four months test operation."
Citation

APA: Akinori Toraiwa Yoshifumi Abe  (2000)  New Hydrometallurgical Process of Copper Anode Slimes at Saganoseki Smelter & Refinery

MLA: Akinori Toraiwa Yoshifumi Abe New Hydrometallurgical Process of Copper Anode Slimes at Saganoseki Smelter & Refinery. The Minerals, Metals and Materials Society, 2000.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account