No assumptions, no surprises

The Australasian Institute of Mining and Metallurgy
M Longbottom G Deans
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
441 KB
Publication Date:
Jul 1, 2021

Abstract

OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The integration of stakeholder values to inform project development influenced the social and environmental outcomes. A Native Title Mining agreement was developed in 12 months. Project primary approval was obtained 12 months from submission, with achievable licence conditions and one public comment. The project moved from a Pre-feasibility Study in 2016 to construction in 2018. Following recent international dam failures, the Tailings Storage Facility (TSF) was a focus for Government approvals and stakeholder engagement. Significant effort was made into understanding the science around potential effects, impacts and risks. A leading practice Impact Assessment Framework that identified Sources, Pathways and Receptors was applied. A process of failure mode identification and layers of protection analysis was undertaken for robust design controls at each stage, while simultaneously transitioning between downstream and upstream discharge arrangements. Participatory selection of the TSF site and design layout was critical in managing project costs and environmental constraints, and in incorporating cultural heritage constraints and technical risks.
Citation

APA: M Longbottom G Deans  (2021)  No assumptions, no surprises

MLA: M Longbottom G Deans No assumptions, no surprises. The Australasian Institute of Mining and Metallurgy, 2021.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account