The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long,
CSO tunnel, multiple underground connections, and significant surface works within
an urban corridor. The NEBT alignment depths range from 60 to 140 ft and includes
seven shafts ranging in depth from 77 to 155 ft with diameters varying from about 19.5
to 56 ft, some as in-line connections and others required adits for connection to the
main tunnel. This paper focuses on the design and construction of two major underground
connections which are the First Street Connector Tunnel and the Mount Olivet
Road Diversion Sewer.
Citation
APA:
(2023) Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023MLA: Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.