OFR-122(6)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Final Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume VI - Appendix C - Drawings

- Organization:
- The National Institute for Occupational Safety and Health (NIOSH)
- Pages:
- 105
- File Size:
- 30943 KB
- Publication Date:
- Jan 1, 1979
Citation
APA: (1979) OFR-122(6)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Final Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume VI - Appendix C - Drawings
MLA: OFR-122(6)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Final Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume VI - Appendix C - Drawings. The National Institute for Occupational Safety and Health (NIOSH), 1979.