OFR-122(6)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Final Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume VI - Appendix C - Drawings

The National Institute for Occupational Safety and Health (NIOSH)
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
105
File Size:
30943 KB
Publication Date:
Jan 1, 1979

Abstract

[ ]
Citation

APA:  (1979)  OFR-122(6)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Final Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume VI - Appendix C - Drawings

MLA: OFR-122(6)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Final Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume VI - Appendix C - Drawings. The National Institute for Occupational Safety and Health (NIOSH), 1979.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account