OFR-5-87 Mine Hoist Electrical Systems Study - Volume II - Data/Analysis System Design Study

- Organization:
- The National Institute for Occupational Safety and Health (NIOSH)
- Pages:
- 152
- File Size:
- 17848 KB
- Publication Date:
- Jan 1, 1985
Abstract
Safe operation and system integrity are two important properties of a mine hoist electrical system. Previous methods used to assess these systems, though rare, have involved extensive downtime and required skilled personnel. The recommended design considerations presented in this report are for a proposed automated system that will perform real time measurements, calculations, and recordings of pertinent performance data. Included are equipment installation and test procedures to be used with the system. The report also contains descriptions of the hoist performance criteria, and how they are to be collected.
Citation
APA: (1985) OFR-5-87 Mine Hoist Electrical Systems Study - Volume II - Data/Analysis System Design Study
MLA: OFR-5-87 Mine Hoist Electrical Systems Study - Volume II - Data/Analysis System Design Study. The National Institute for Occupational Safety and Health (NIOSH), 1985.