OFR-5-87 Mine Hoist Electrical Systems Study - Volume II - Data/Analysis System Design Study

The National Institute for Occupational Safety and Health (NIOSH)
Organization:
The National Institute for Occupational Safety and Health (NIOSH)
Pages:
152
File Size:
17848 KB
Publication Date:
Jan 1, 1985

Abstract

Safe operation and system integrity are two important properties of a mine hoist electrical system. Previous methods used to assess these systems, though rare, have involved extensive downtime and required skilled personnel. The recommended design considerations presented in this report are for a proposed automated system that will perform real time measurements, calculations, and recordings of pertinent performance data. Included are equipment installation and test procedures to be used with the system. The report also contains descriptions of the hoist performance criteria, and how they are to be collected.
Citation

APA:  (1985)  OFR-5-87 Mine Hoist Electrical Systems Study - Volume II - Data/Analysis System Design Study

MLA: OFR-5-87 Mine Hoist Electrical Systems Study - Volume II - Data/Analysis System Design Study. The National Institute for Occupational Safety and Health (NIOSH), 1985.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account