Olympic Dam open stope observations, tactics and characterisation

The Australasian Institute of Mining and Metallurgy
E Jones N Mitkas G Capes L Morizzi D Grant
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
13
File Size:
1412 KB
Publication Date:
Mar 15, 2021

Abstract

This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 years of production, using a qualitative description of the factors influencing performance. Utilising a continuous improvement tool, the Plan-Do-Check-Act (PDCA) process, and a forward-looking rock mechanics program, the intent is to identify the key factors driving productivity and performance to create a stable and achievable long term mine plan.
Citation

APA: E Jones N Mitkas G Capes L Morizzi D Grant  (2021)  Olympic Dam open stope observations, tactics and characterisation

MLA: E Jones N Mitkas G Capes L Morizzi D Grant Olympic Dam open stope observations, tactics and characterisation. The Australasian Institute of Mining and Metallurgy, 2021.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account