On-Line Analysis For Advanced Process Control At J. R. Simplot's Smoky Canyon Phosphate Mine

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 361 KB
- Publication Date:
- Jan 1, 1996
Abstract
The Smoky Canyon Mine has recently installed a PROMPTED GAMMA NEUTRON ACTIVATION ANALYSIS (PGNAA) on-line analyzer as part of a long-term advanced process control program. The on-line analyzer was adapted from a continuous dry analyzer and a large on-stream wet analyzer to a compact, multiplexed 3" slurry analyzer. The analyzation feed system utilizes a multiplexer system to accommodate up to fourteen (14) different plant process streams. The corresponding sampling system also provides for dewatering of sample streams too dilute for timely analysis. Key analysis includes, but is not limited to, phosphorus, aluminum, magnesium, calcium, and potassium. This data currently allows plant operations to be manually evaluated and controlled. Future development of a plant-wide supervisory control system will utilize the data for plant operations. This paper discusses the design, installation, and operation of the PGNAA on-line analyzer at the Smoky Canyon Mine.
Citation
APA:
(1996) On-Line Analysis For Advanced Process Control At J. R. Simplot's Smoky Canyon Phosphate MineMLA: On-Line Analysis For Advanced Process Control At J. R. Simplot's Smoky Canyon Phosphate Mine. Society for Mining, Metallurgy & Exploration, 1996.