Operational Practice with the Waelz Kiln and Leaching Plant of Tsu in Taiwan

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 15
- File Size:
- 808 KB
- Publication Date:
- Jan 1, 2000
Abstract
The Waelz Plant at Taiwan Steel Union Co. Ltd. (TSU) was erected within nine months from September 1, 1998 to May 15, 1999. The nominal capacity of the plant is 50,000 tonnes per year of electric are furnace dust (EAFD). The plant, consisting of material handling, a waelz kiln, a waste gas cleaning system, waelz oxide leaching and waste water treatment, was commissioned within three months from July 1, 1999 until October 12, 1999. The specific problem of the plant is the high chlorine content in the EAFD pellets which is up to 6 %. Lurgi Metallurgie GmbH, Frankfurt, Germany was responsible for the engineering erection and commissioning of the plant.
Citation
APA:
(2000) Operational Practice with the Waelz Kiln and Leaching Plant of Tsu in TaiwanMLA: Operational Practice with the Waelz Kiln and Leaching Plant of Tsu in Taiwan. The Minerals, Metals and Materials Society, 2000.