Orapa 3 Plant Conceptual Design Evolution In Action (Let The Ore Dictate The Plant That You Build!!)

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 28
- File Size:
- 7094 KB
- Publication Date:
- Jan 1, 2010
Abstract
Commencing with the Pre-Feasibility Study (PFS) conclusions, the Orapa 3 process design evolved through a phase of value-engineering studies. An overall re-evaluation of the originally proposed process design was necessary both in order to address the interim increase in target throughput from 9.8 Mtpa to 12 Mtpa as well as to increase capital efficiency. In the interests of clarity, the PFS process design for Orapa 3 has been omitted from this paper, as it is no longer relevant. Recognition is however due to those engaged in earlier phases of the Orapa 3 project with respect to fundamental mass-balancing modelling; and ore and diamond characterization, which fanned the basis for the process design that has evolved from feasibility study activities.
Citation
APA:
(2010) Orapa 3 Plant Conceptual Design Evolution In Action (Let The Ore Dictate The Plant That You Build!!)MLA: Orapa 3 Plant Conceptual Design Evolution In Action (Let The Ore Dictate The Plant That You Build!!). The Southern African Institute of Mining and Metallurgy, 2010.