Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysis

The Australasian Institute of Mining and Metallurgy
H Kurth
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
886 KB
Publication Date:
Mar 22, 2022

Abstract

Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine on the near surface of Southern Oyu deposit and developing underground block-caving mine at the Hugo Dummet North where 80 per cent of total resources exists. Oyu Tolgoi (OT) commenced open pit mining in 2011 and implemented an industry standard blasthole sampling, and ordinary kriging grade control estimation with block-out process. Since 2017, grade control improvement projects have successfully completed that have led to the implementation of current, improved grade control system. Geological model is updated by blasthole logging on Leapfrog® and used for daily grade estimations. GC estimation is proceeded solely on Vulcan® by running Lava script and integrating with a relational database. Combination of block-out procedure produces GC model which is updated in Vulcan® and as well as in the database simultaneously. Switching to the integrated database eliminated many manual processes such as importing and exporting data and enabled access to the database anytime, anywhere and from any device. Thereby, these improvements allowed to increase an efficiency, create a comprehensive reconciliation system and reduce operational risks. We are looking forward to expanding applications of integrated grade control data stored in the database. This paper outlines how the grade control system was developed at OT’s open pit mine, and how it is integrated into the short range mine planning, mine reconciliation workflow and ultimately enabled development of various automated reporting systems.
Citation

APA: H Kurth  (2022)  Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysis

MLA: H Kurth Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysis. The Australasian Institute of Mining and Metallurgy, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account