Otjikoto Mill Leach Operation in 2015–2016

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 12
- File Size:
- 1152 KB
- Publication Date:
- Jan 1, 2017
Abstract
The Otjikoto Mine, owned at 90% by B2Gold Corporation, is located 300 km north of Namibia’s capital city of Windhoek. The reserves from the open pit mine, estimated at 25.9 million tons with an average grade of 1.28 g/t Au, contain gangue minerals, pyrite and pyrrhotite, and have an estimated 10 year mine life. The feasibility study included an optimisation of gold leaching using CSTR for the original design. The results of the test work were used to establish the design criteria. Gravity tails from three composites (drill cores), representing the major ore types, were used. The XR3 sample (gravity tails) contained 0.32 g/t Au, while the XR2 and XR1 gravity tails samples (used for variability) contained, respectively, 0.30 g/t Au, and 0.47 g/t Au. The optimum leaching conditions were: a pre-treatment of 7 h at pH 10.5 with 100 g/t lead nitrate, DO > 5 ppm followed by cyanidation at 300 ppm NaCN, pH 10.0, DO > 5 ppm for 48 h. The gold extraction was 91.5% (97.2% overall extraction gravity/leach) and the cyanide addition was 0.57 kg/t NaCN. Increasing the DO to 16 ppm did not show any economic benefits. No pre-treatment or a 4-h pre-treatment reduced the gold leaching kinetics. The XR2 and XR1 gravity tails samples had gold extractions of 92.9% and 92.3%, respectively. At the plant scale, an 11 h pre-treatment is used followed by 42 h cyanidation with 250 ppm NaCN and an average DO of 8 ppm and 230 g/t lead nitrate in 2016. The cyanide addition was 0.49 kg/t NaCN. The commercial operation started on February 28th, 2015. The overall gold recovery and production were 98.4% and 145,696 ounces for 2015 and 98.1% and 166,286 ounces for 2016. It was found that retention times, gold content of leach residues and cyanide addition are comparable for the lab and the plant. Details of the Otjikoto process flowsheet are discussed in this paper along with the results of the lab leach optimisation test program and the plant leach circuit performance and improvements.
Citation
APA:
(2017) Otjikoto Mill Leach Operation in 2015–2016MLA: Otjikoto Mill Leach Operation in 2015–2016. Canadian Institute of Mining, Metallurgy and Petroleum, 2017.