P3 Delivery for the I-75 Storage and Drainage Tunnel, Detroit, Michigan - NAT2024

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 597 KB
- Publication Date:
- Jun 23, 2024
Abstract
The I-75 Modernization Project (Segment 3) just north of Detroit, MI is being delivered as a Design-Build-Finance-Maintain (DBFM), which is a Public Private Partnership (P3). The project includes design and reconstruction of 5.5 miles of freeway, including a depressed section with a 20,630-ft long, 14.5-ft inside diameter, up to 100-ft deep stormwater tunnel, multiple drop shafts, and a pump station. The project also includes a maintenance term of 25-years. This is the first time MDOT has used a P3 delivery method for a major highway and tunnel project. This paper describes the development of the P3 documents, including performance-based tunnel and shaft technical requirements, and the approach to project risk management, financing, and insurance coverage.
Citation
APA:
(2024) P3 Delivery for the I-75 Storage and Drainage Tunnel, Detroit, Michigan - NAT2024MLA: P3 Delivery for the I-75 Storage and Drainage Tunnel, Detroit, Michigan - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.