Performance Evaluation Of Friction Stabilizer Bolts

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 4
- File Size:
- 282 KB
- Publication Date:
- Jan 1, 2005
Abstract
A series of in situ pull test were performed on a new design friction stabilizer bolt with the objective of determining its performance characteristics. The bolt is installed while drilling, thus improving safety and significantly reducing the installation time. An optional expansion element can be inserted into the bolt to provide an end-anchorage, which further increases the bolt’s capacity. In situ tests show that the pull capacity of the 2 m long new design bolt is about 15 tons. When installed with an expansion element, the pull capacity of these bolts becomes as high as 30 tons.
Citation
APA:
(2005) Performance Evaluation Of Friction Stabilizer BoltsMLA: Performance Evaluation Of Friction Stabilizer Bolts. Society for Mining, Metallurgy & Exploration, 2005.