Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

Canadian Institute of Mining, Metallurgy and Petroleum
D. Kong L. McGilp A. Klyashtorin I. Wilson
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
16
File Size:
1258 KB
Publication Date:
Jan 1, 2020

Abstract

This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at the legacy Gunnar uranium mine & mill site that was abandoned in the 1960s with limited to no decommissioning. The flooded Gunnar mine pit presently contains about 3.2 million m3 of water contaminated by dissolved U (1.2 mg/l), Ra-226 (0.4 Bq/l), and minor concentrations of other contaminants (As, Se, etc.). The water is seeping over the pit rim into Lake Athabasca posing environmental and health concerns. Iron oxide coated sands can be used to immobilize uranium species through an adsorption process. Methods for preparation of hydrous ferric oxide sorbents and their supported forms onto silica sands are described. Fourier transform infrared spectroscopy (FTIR), and powder X-ray diffraction (pXRD) were used to characterize the physical-chemical properties of the sorbent. The monolayer uranium uptake capacity (Qm) was estimated through the Langmuir adsorption isotherm. Adsorption kinetic experiments were performed in a lab environment before moving to a field trial. Based on these lab results and the input on field-scale appropriate geometries, a pilot permeable reactive barrier was fabricated and a field test conducted near the Gunnar pit in June 2019. This pilot test provided technical data and information needed for designing a full-scale permeable barrier based on the iron oxide coated sands, which may be applied for in-situ water treatment at Gunnar and other legacy uranium sites.
Citation

APA: D. Kong L. McGilp A. Klyashtorin I. Wilson  (2020)  Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

MLA: D. Kong L. McGilp A. Klyashtorin I. Wilson Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit. Canadian Institute of Mining, Metallurgy and Petroleum, 2020.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account