Abstract
The Pinkerton Tunnel Open Cut Project is part of the National Gateway Clearance Initiative improvement project to achieve a minimum of 6.4 meters (21 feet) of vertical clearance along CSX Transportation rail corridor so that double-stacked intermodal railcars can be transported between Mid-Atlantic States and their ports to Midwest Markets in the U.S.
Citation
APA:
(2014) Pinkerton Tunnel Open Cut ProjectMLA: Pinkerton Tunnel Open Cut Project. International Society of Explosives Engineers, 2014.