Pit-Blend Optimisation - A Case Study in Iron Ore

The Australasian Institute of Mining and Metallurgy
Piotto P
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
4
File Size:
338 KB
Publication Date:
Jan 1, 1996

Abstract

Pit optimisation algorithms are designed to produce a pit with maximum value, but for certain minerals like iron ore, limestone, coal, etc, it is also necessary that the designed pit contains ore which meets the customer's chemical specifications. This paper describes a technique of using linear programming for blending optimisation and the Lerchs-Grossmann algorithm (as in Whittle's 3D software) for pit optimisation in tandem, to achieve pit designs of targeted grade specifications.
Citation

APA: Piotto P  (1996)  Pit-Blend Optimisation - A Case Study in Iron Ore

MLA: Piotto P Pit-Blend Optimisation - A Case Study in Iron Ore. The Australasian Institute of Mining and Metallurgy, 1996.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account