Planning of Underground Copper Mining

The Southern African Institute of Mining and Metallurgy
J. K. Williams M. P. Wells
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
4
File Size:
1061 KB
Publication Date:
Jan 1, 2014

Abstract

"As part of the planning system at each division of Nchanga Consolidated Copper Mines, Limited, the Mine Planning Department is required to produce a detailed production schedule for each shaft.Because of the difficulties in producing a schedule which satisfies all the mining constraints, and because of the large clerical effort involved, the full range of possible schedules can never be considered.It has been found possible to produce a schedule using linear programming which satisfies the majority of the many varied mining constraints. Computer programs have been written to enable the mine planning department to use this mathematical system without assistance.The system has a large degree of flexibility to enable the planner to include conditions which cannot be incorporated readily in the linear program. This system permits the more efficient production and evaluation of schedules and reduces the amount of clerical effort."
Citation

APA: J. K. Williams M. P. Wells  (2014)  Planning of Underground Copper Mining

MLA: J. K. Williams M. P. Wells Planning of Underground Copper Mining. The Southern African Institute of Mining and Metallurgy, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account