Predicting Productivities And Capital Equipment Requirements Using The PSU/USBM Coal Mine Simulator

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 25
- File Size:
- 713 KB
- Publication Date:
- Jan 1, 1976
Abstract
This paper introduces a philosophy of dynamic modeling. Here, the development of a simulation model of a coal mining system is described for the purposes of: (a) system design and selection of equipment for a new operation; (b) analysis of existing operation' for possible alterations, additions, or general improvements.
Citation
APA:
(1976) Predicting Productivities And Capital Equipment Requirements Using The PSU/USBM Coal Mine SimulatorMLA: Predicting Productivities And Capital Equipment Requirements Using The PSU/USBM Coal Mine Simulator. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1976.