Pregrouting In A Full-Face Bored Tunnel

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 460 KB
- Publication Date:
- Jan 1, 1981
Abstract
The Norwegian contracting firm A/S Høyer-Ellefsen has for the last 2.5 years carried out substantial pregrouting in a 7600m long tunnel just outside the city of Oslo. This has been done to avoid groundwater lowering and consequent damage to surface structures. A WIRTH TBM is used in combination with a 2 boom Atlas Copco hydraulic jumbo for the drilling of groutholes in front of the machine. The detailed procedure for the drilling and grouting will be discussed, and the results obtained will be presented.
Citation
APA:
(1981) Pregrouting In A Full-Face Bored TunnelMLA: Pregrouting In A Full-Face Bored Tunnel. Society for Mining, Metallurgy & Exploration, 1981.