Pregrouting In A Full-Face Bored Tunnel

Society for Mining, Metallurgy & Exploration
Thor Skjeggedal
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
460 KB
Publication Date:
Jan 1, 1981

Abstract

The Norwegian contracting firm A/S Høyer-Ellefsen has for the last 2.5 years carried out substantial pregrouting in a 7600m long tunnel just outside the city of Oslo. This has been done to avoid groundwater lowering and consequent damage to surface structures. A WIRTH TBM is used in combination with a 2 boom Atlas Copco hydraulic jumbo for the drilling of groutholes in front of the machine. The detailed procedure for the drilling and grouting will be discussed, and the results obtained will be presented.
Citation

APA: Thor Skjeggedal  (1981)  Pregrouting In A Full-Face Bored Tunnel

MLA: Thor Skjeggedal Pregrouting In A Full-Face Bored Tunnel. Society for Mining, Metallurgy & Exploration, 1981.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account