Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon Mine

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 579 KB
- Publication Date:
- Jan 1, 1991
Abstract
Pan Australian Mining lid installed a milling and gold leaching plant designed to process 2 million tonnes per annum of breccia sulphide ore. This plant was commissioned in January 1989. Since commissioning, increased ore reserves have been established and the plant has been expanded by the addition of one ball mill and several tanks to increase the design capacity to 3 million tonnes per annum. This additional plant was commissioned in May 1990, bringing the total number of mills up to three, each 4.5 m diameter x 7 m long. The paper details how milling rates have been increased at the expense of grind size to increase the capacity of the original plant from 2 million to 3.1 million tonne per year rate before the additional ball mill was Commissioned.
Citation
APA: (1991) Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon Mine
MLA: Primary Ore Milling at Pan Australian Mining Ltd Mt Leyshon Mine. The Australasian Institute of Mining and Metallurgy, 1991.