Process Flowsheet Development For The Pullalli Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 2
- File Size:
- 130 KB
- Publication Date:
- Jan 1, 1996
Abstract
Pegasus Minera de Chile, Ltda. is completing three phases of metallurgical evaluation on the Pullalli project to develop a preliminary process flowsheet. A project feasibility study is in progress. The feasibility study includes a proposed process flowsheet designed based on results from the multiple stages of metallurgical evaluation. Phases I and II of metallurgical evaluation included laboratory scale heap leach and milling cyanidation testwork on multiple drill core composites and bulk ore samples from the Pullalli Project. Phase Ill included pilot scale milling/cyanidation testwork on Pullalli drill core composites. The proposed flowsheet includes selective mining and separate processing of low grade and high grade ores. Low grade ore will be crushed and heap leached. High grade ore will be milled leached for 12 hours in an agitated cyanidation circuit. After 12 hours of leaching, sands and slimes will be separated and the sands will be washed using a counter current cyclone (CCC) circuit. Partially leached and washed sands will be added to the crushed low grade ore for heap leaching treatment and permanent placement. Partially leached slimes will be thickened in a high capacity thickener and will be processed in a CIP circuit. Leached slimes will be placed in a tailings impoundment.
Citation
APA:
(1996) Process Flowsheet Development For The Pullalli ProjectMLA: Process Flowsheet Development For The Pullalli Project. Society for Mining, Metallurgy & Exploration, 1996.