Process Improvements At Mantoverde Heapleach-SX-EW Plant

The Minerals, Metals and Materials Society
L. Trincado
Organization:
The Minerals, Metals and Materials Society
Pages:
7
File Size:
157 KB
Publication Date:
Jan 1, 2003

Abstract

Mantoverde is a heap leach-SX-EW plant that was commissioned in December 1995 at a production rate of 42,130 ton of copper per year and 5.4 million ton of ore per year. Copper production has steadily been increased to 57,290 ton in 2002. Forecast copper production for 2003 is 60,000 ton for an ore treatment rate of 8.5 million ton. Several improvements in the heap leach process have been implemented. The main process improvements are related to the optimization of heap height, particle size, irrigation rate and leach cycle, in addition to a better heap drainage design and a solution management system. A first dump leach operation was started in 1999 at a production rate of 1,922 ton of copper. A second dump leach operation was started in early 2002 at a production rate of 2,805 ton of copper. Dump leach production will be increased over time to as much as 24,000 ton of copper. The main heap leach process improvements, as compared to the original plant design, as well as the main dump leach operating parameters are discussed in this paper.
Citation

APA: L. Trincado  (2003)  Process Improvements At Mantoverde Heapleach-SX-EW Plant

MLA: L. Trincado Process Improvements At Mantoverde Heapleach-SX-EW Plant. The Minerals, Metals and Materials Society, 2003.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account