Production of Zinc in the Modernised Pasminco Metals - EZ Plant, Hobart Tasmania
    
    - Organization:
 - The Australasian Institute of Mining and Metallurgy
 - Pages:
 - 8
 - File Size:
 - 216 KB
 - Publication Date:
 - Jan 1, 1993
 
Abstract
Commercial production of zinc started at the Pasminco Metals - EZ Plant,  Hobart, Tasmania, in 1921. Since that time the capacity of the plant has  been steadily increased to its present level of almost 220 000 tpa. Major  areas of the plant have been successively upgraded over a number of  years, (Roasters, 1969, 1975; Acid Plants, 1981; Casting, 1972; Residue  Treatment Plant, 1971), but, until recently, the leach/purification area  remained virtually unchanged from the time the plant was built. The major redevelopment of the hydrometallurgical plant began with  fully integrated pilot plant testing of the proposed new circuit in 1981.  The pilot plant incorporated the Low-contaminant Jarosite Process, and a  new two-stage zinc dust purification procedure. In 1985, approval was granted for a major modemisation program  which involved the complete replacement of most of the leaching and  purification plants, and substantial improvements to the residue treatment  plant. Construction of the first of the new plant sections, Strong Acid  Leaching, commenced in 1986. This paper describes briefly the modernisation program itself, and the  current method of zinc production at the PMEZ plant. The new plant  sections comprise a Strong Acid Leach stage to improve lead residue  grade; a Preneutralisation stage to reduce metal losses in jarosite; new  filtration stages for both jarosite and lead residue; new Neutral Leach and  Weak Acid Leach stages to replace old equipment; a new Solution  Purification stage to replace the use of organic reagents to remove cobalt;  and a new Gypsum Removal stage to cool the solution before electrolysis. At the completion of the modernisation program, only the electrolytic  cellhouse remains of the early plant sections.
Citation
APA: (1993) Production of Zinc in the Modernised Pasminco Metals - EZ Plant, Hobart Tasmania
MLA: Production of Zinc in the Modernised Pasminco Metals - EZ Plant, Hobart Tasmania. The Australasian Institute of Mining and Metallurgy, 1993.