Production Planning and Control

The Southern African Institute of Mining and Metallurgy
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
4
File Size:
1774 KB
Publication Date:
Jan 1, 2014

Abstract

"Chairman: Professor C. O. Frush Rapporteur: Mr A. C. SchmidtPapers:Planning of underground copper mining by J. K. Williams, L. Smith and M. P. WellsLinear programming models of copper leach and solvent extraction plants by W. P. C. Duyvesteyn, J. R. Cutland and J. R. L. RusselPlanning and forecasting stope production by D. W. Kappes and P. F. X. Moussett-JonesA proposed method of dynamic ore reserve assessment for a caving system of mining by A. F. Spinks and S. P. NicholsThe initial point made by Mr L. Smith in presenting his paper was that the planning aid outlined in the preprint was neither sophisticated nor complicated. However, it was a system which worked and was a very real way in which the computer was being used to assist miners, in particular, who at the present moment have very little experience in the use of computers.Mr Smith apologised for the fact that the editors of the paper had eliminated all reference to 'time'. This was very unfortunate because the essence of the system was that it saved time, which was one of the main points made in the paper.The operations being planned by this means cover the Rokana orebody which is a stratiform body mined by open stoping.The planner has to decide how much ore to mine from each base in each time period of his plan, that is, from three to four months hence to a year ahead. Normal procedure is for the planner to have discussions with the underground manager on some of the information he requires. The sort of information needed is (i) tramming limits for each face, (ii) extraction and grade factors, (iii) the present status of mining operations so that the planner knows where to start the new plan, and, (iv) details of any other mining consider¬ations that need to be incorporated in the plan.The objective at this point is to produce an initial plan for discussion purposes. All the information required comes from one sheet per stops and shows, inter alia, the stope identifier, the length along strike, the ore tonnage, the copper and cobalt grades and, finally, the extraction and grade factors.The program itself, among many other things, checks the data for validity, compatibility, completeness and credibility and prints error messages accordingly. Output from this system is in the form of a summary of production from each face, as well as giving the figures of ore reserve depletion. This summary indicates which slopes are to be mined in this time period, the original survey grades (copper and cobalt), the estimated production grades, how much is to be mined from each stope and the copper and cobalt production accordingly."
Citation

APA:  (2014)  Production Planning and Control

MLA: Production Planning and Control. The Southern African Institute of Mining and Metallurgy, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account