The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes under significant pressure to meet the safety, schedule, cost, and start-up committments. For the design team the principal tasks are to finalize detailed design, complete procurement, and issue construction contracts.
Design activities must be closely coordinated with equipment and material procurement. A clear engineering plan should be based on well-defined work packages to meet construction, commissioning, and startup requirements. A range of review processes by discipline, area, and third parties assure quality. Constructability, safety, and hazard reviews are performed throughout the design process.
Three-dimensional models that incorporate extensive databases help to maximize efficiency and minimize errors. Well-managed projects have a clearly accountable design team, rigorous change control processes, and well-defined workflows. Key individuals from the design team participate in commissioning, operator training, and startup.
Citation
APA:
(2015) Project ImplementationMLA: Project Implementation. Canadian Institute of Mining, Metallurgy and Petroleum, 2015.