Recent improvements in the milling circuit at Tropicana mine

The Australasian Institute of Mining and Metallurgy
G R. Ballantyne M Di Trento I Lovatt B Putland
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
11
File Size:
880 KB
Publication Date:
Sep 11, 2017

Abstract

The Tropicana Gold Mine, owned by AngloGold Ashanti Australia Ltd (70% owned and managed) and Independence Group NL (30%) is located 330 kilometres east-northeast of Kalgoorlie, Australia, in the newly developed Albany-Fraser Orogen. Following extensive feasibility studies, a high pressure grinding roll (HPGR)-ball milling circuit was selected based on the reduced power requirements and thus reduced operating expenses. The HPGR-ball mill circuit was estimated to require 75% of the energy of a standard semi-autogenous grinding (SAG) mill circuit. Even with an anticipated greater capital cost, the HPGR-ball mill circuit was found to give significantly better financial returns in all cases investigated in the feasibility study. A comparison between the specific energy requirements of the HPGR, crush and SAG based circuits (SABC) from the feasibility work was conducted and the HPGR circuit was found to be considerably more energy efficient. A survey was conducted and the efficiency of the HPGR was similar to both the overall circuit design and the HPGR laboratory results, reflecting the accuracy that is possible for design and operation of HPGR circuits.Between 2015 to 2016, the Tropicana circuit has achieved a 20% increase in throughput from 780 to 930 t/h, and this increase has been maintained in 2017. This improvement can largely be attributed to upgrades to material handling processes, increased HPGR speed and smaller HPGR screen apertures. The result of these changes has been to increase the ball mill capacity by increasing the breakage conducted by the HPGR.CITATION:Ballantyne, G R, Di Trento, M, Lovatt, I and Putland, B, 2017. Recent improvements in the milling circuit at Tropicana mine, in Proceedings MetPlant 2017, pp 73–83 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: G R. Ballantyne M Di Trento I Lovatt B Putland  (2017)  Recent improvements in the milling circuit at Tropicana mine

MLA: G R. Ballantyne M Di Trento I Lovatt B Putland Recent improvements in the milling circuit at Tropicana mine. The Australasian Institute of Mining and Metallurgy, 2017.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account