Recent Shaft Development at Ballarat

The Australasian Institute of Mining and Metallurgy
Zeni J. T
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
10
File Size:
1045 KB
Publication Date:
Jan 1, 1992

Abstract

Gold was mined from quartz bodies at Ballarat East from the 1850s until closure of the last mine in 1917. The average depth of mines was about 350 m.Ballarat Goldfields Limited (BGL) carried out diamond drilling from surface between 1985 and 1987 which proved the continuation of gold-quartz mineralisation beneath the old mines.During 1989 an underground development program was commenced to access the mineralisation for detailed exploration. The program included two simultaneous shaft developments. These were known as B2 shaft and Llanberris No.1 shaft.
Citation

APA: Zeni J. T  (1992)  Recent Shaft Development at Ballarat

MLA: Zeni J. T Recent Shaft Development at Ballarat. The Australasian Institute of Mining and Metallurgy, 1992.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account