Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024

Society for Mining, Metallurgy & Exploration
Ryan O’Connell Daniel Willis
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
572 KB
Publication Date:
Jun 23, 2024

Abstract

An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded within highly weathered shale bedrock units, which induced unloading stress on the original tunnel liner. An epoxy-impregnated carbon fiber fabric wrap manufactured by Sika was chosen to repair the failed adit tunnel liner. Kilduff Underground Engineering completed the design of the tunnel repair utilizing both empirical and numerical methods. Merco Engineering Contractors completed the injection of chemical grout and repair liner installation.
Citation

APA: Ryan O’Connell Daniel Willis  (2024)  Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024

MLA: Ryan O’Connell Daniel Willis Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024. Society for Mining, Metallurgy & Exploration, 2024.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account