Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

- Organization:
- Deep Foundations Institute
- Pages:
- 14
- File Size:
- 718 KB
- Publication Date:
- Jan 1, 2016
Abstract
"The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB was responsible for the design of the Brooklyn Connector which includes construction of approximately 2000 feet of new staged earth-filled embankments utilizing prefabricated modular retaining walls (T-Walls®). The proposed embankments will be constructed adjacent to and beneath the existing Brooklyn Queens Expressway (BQE) viaduct while the existing viaduct remains in service. Critical aspects of the settlement assessment relating to the soils supporting the existing BQE will be addressed, as their behavior drives the deformation of the viaduct. Furthermore, a construction monitoring program was used to enable the designer to assess settlement predictions and allow SKE to mitigate potential impacts to the existing BQE during construction. Additionally, the methodology for installation of the embankments in a limited access area underneath an active viaduct supported on settlement sensitive shallow foundations will be presented.INTRODUCTIONSkanska-Kiewit-ECCO III Joint Venture, in association with HNTB was contracted by the New York State Department of Transportation (NYSDOT) to design and construct the Phase 1 replacement of the Kosciuszko Bridge Design-Build Project. Phase 1 of the project involves the design and construction of the new eastbound structures of Interstate 278 over Newtown Creek from Brooklyn to Queens. The project runs between Morgan Avenue in Brooklyn and the Long Island Expressway Interchange in Queens (approx. 1.1 miles) and includes the staged demolition of the existing structures."
Citation
APA:
(2016) Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction ApproachMLA: Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach. Deep Foundations Institute, 2016.